HEBEI WELDING EQUIPMENTS CO., LTD

 

       ZX7 Series Counter-Variant DC Arc Welding Machine

  This welding machine is a kind high-efficient and energy-saving welding equipment. With adoption of advanced integrated circuit control and IGBT (VMOS) middle-frequency counter-variant technology, this welding machine enjoys such advantages as easily striking arcs, smooth arc, small spatter, beautiful welding seam and wide applying range of currency. It also has such properties as small volume, light weight, high reliability and easy carrying about.     

 

Safety notice!

Important show:

    Welding process, not switching function switch to prevent damage to machines.

    For cutting, they must first get rid of the rapid plugs connected with the welding tongs to ensure continuous welding clamp with the mainframe to protection against.

    Use the safety equipment required to install leakage protection switching.

    Authorized the use of national security supervision departments of labor protection welding supplies.

    The operator must have a valid "metal welding (OFC) operations," the certification of the special operations personnel.

    Electric shock-will cause serious injury!

    According to application criteria installed grounding device.

    Parts of the welding.

    Ensure that the insulation is between you and the ground state and the workpiece.

    Ensure your work place is safe.

    Smoke-will be harmful to health!

    Let's head to remain the smoke outside.

    In welding, the use of ventilation and exhaust devices, to avoid breath smoke.

    Arc radiation-damage your eyes, skin burns!

    Suitable welding masks and filters, wear protective clothing to protect your eyes and body.

    A suitable masks or screens to protect spectators from harm.

    Fire-welding spark may lead to fire, without confirmation welder nearby combustibles, please pay attention to fire safety.

    Noise-excessive noise harmful to people's hearing

    Protect your ears, or put to other use hearing protection ear protective shelter materials.

    Warning bystanders, potential noise will hurt their hearing.

    Fault-encountered difficulties, seek professional help.

    If you meet difficulties in the installation and operation, please check the relevant contents of this handbook.

 

DC arc welding machine

The welding machine is used in the manufacture of advanced inverter technology. Study on V-MOS FET devices is the use of high-power inverter control, 50/60HZ switch to the working frequency for high-frequency (100KHZ above), and hypotension rectifier. by pulse width modulation (PWM) DC power source output, the main transformer weight, volume has dropped dramatically. improve efficiency by more than 30%. Igniter system uses high-frequency oscillation theory. Their characteristics are as follows : stable, reliable, portable, energy electromagnetic noise.

Arc we lding machine is a series of features : efficient, energy, light and has good dynamic characteristics, arc stability, Rong Chi easily controlled. The high thrust-load voltage of the energy and better compensation. A wide range of uses, can be used for high-altitude operations, field operations, and indoor and outdoor decoration, and is small in size compared to similar products. light weight, easy installation, easy operation and so on.

First. The main technical parameters

1-1. Parameter Table

Parameters

ZX7-160

ZX7-200

ZX7-200B

ZX7-250

Supply voltage (V)

Single-phase 220V±15

Three-phase AC380V±15

Rated input current (A)

24

32

32

15

No-load voltage (V)

70

56

62

54

Output current adjustment (A)

30-160

20-200

20-200

20-250

Rated output voltage (V)

27

28

28

30

Thrust tuning range (A)

-

-

0-100

0-100

Load sustained rate (%)

90

40

60

60

No-load loss (W)

40

40

40

60

Efficiency (%)

85

85

85

85

Power Factor

0.93

0.93

0.93

0.93

Insulation Level

B

B

B

B

Protective casing grades

IP21

IP21

IP21

IP21

Weight (kg)

8

8

810

15

Dimension (mm)

371×155×295

371×155×295

425×205×355

480×210×310

 

Parameters

ZX7-315

ZX7-400

ZX7-400B

ZX7-500

Supply voltage (V)

Three-phase AC380V±15

Rated input current (A)

20

28

28

38

No-load voltage (V)

69

67

67

67

Output current adjustment (A)

20-315

20-400

20-400

20-500

Rated output voltage (V)

33

36

36

40

Thrust tuning range (A)

0-100

0-100

0-100

0-100

Load sustained rate (%)

60

40

60

60

No-load loss (W)

80-100

100

100

100

Efficiency (%)

85

85

85

85

Power Factor

0.93

0.93

0.93

0.93

Insulation Level

B

B

B

B

Protective casing grades

IP21

IP21

IP21

IP21

Weight (kg)

18

28

35

52

Dimension (mm)

450×300×290

565×305×495

540×365×370

700×335×630

Second. The installation

2-1. Power Line Link

1) Each machine is equipped with a power line. Weld should accept the input voltage to a corresponding voltage lines, not to accept the wrong voltage.

2) Power Connection with the counterparty to a power socket or good contact to prevent oxidation.

3) Using Multimeter measuring about whether the value of the input voltage fluctuation range.

2-2. The output link

1) Each equipped with two quick plug welding, the former face of rapid quick plug socket. Turn to be forced to ensure good contact, to work long hours of work will be destroyed when the current plug and socket. This should arouse sufficient attention.

2) Link to put before the panel welding electrode, the cathode workpiece then, and red quickly to the other end plugs Xianqian link link hands with attention within 2.60s board, so that the second cable (on line and earth) good contact with the rapid plugs, Otherwise, they will burn quickly plugs.

 3) Should pay attention to the wiring polarity, DC welder general there are two ways : being wiring and plug;

Normal Law : Welding then being put anode, cathode then workpiece; (Applicable to acidic electrode)

Opposition  Law : workpiece then plug anode, cathode then put welding. (Applicable to stainless steel, cellulose and other basic rod)

According to the workpiece and welding technology requirements selected arc of instability will occur if a poor choice. Splash of other large and sticky, such a situation can easily swap plugs rapid change polarity.

4) If the workpiece and welding away (50-100 meters). Used in the second line (on line and earth) long, this should be an appropriate choice of wire Cross-sectional area greater, to reduce cable voltage drop.

2-3. Inspection

1) Whether the standard welder made reliable grounding.

  2) Whether all nodes good contacts (especially to Xianqian contact with the workpiece).

3) Line of output put it shorted.

4) Whether the output polarity is correct.

5) If the choice of circuit protection device leakage current<30mA.

  6) Welding spatter could catch fire, it is necessary to check the neighborhood or other combustibles.

Third. The operation

3-1. Operation (panel attached map)

  1) Open the Power Switch, the first display table set current value, the fan begins to rotate.

  2) Users need to regulate "welding current adjustment knob" and "arc thrust knob." welding properties meet the requirements.

  3) Under normal circumstances, the value of welding electrodes and welding current counterparts :

         φ2.5: 70-100A;φ3.2:110-160A;φ4.0:170-220A;φ5.0:230-280AΦ 70-100A; φ 3.2:110-160A; φ 4.0 : 2.5 : 170-220A; φ 5.0:230-280A

4) "Arc thrust Knob" is used for adjusting welding properties. especially in a small area with the current "welding current adjustment knob" used in conjunction, can easily adjust the size of current arc, and from "welding current adjustment knob" control, a small current welding, Current thrust will be to achieve greater energy simulation of the effects of rotation DC welder.

5) If a welder remote control device :

  A  Former welder used to determine the location of remote switching options, as measured by lower home use remote control. ON stall on the remote control device for home use.

B  Remote control socket plugs inserted correctly, Turn. Prevent barred from access.

C  No remote control device, to choose their own switch in the "OFF", or else Current regulation on the plane could not use.

D  Some users in the process of moving welder, remote switching collision inadvertently put the wrong place, failure to adjust welding. he wrongly believed that the failure was caused machines to draw attention.

3-2. Allow duty cycle

  1) Requires strict theory of duty cycle. (See Table technical parameters)

  2) Load over sustained rate, in the welding process, welding operations will suddenly stop, This is a welder overload of work, internal thermal components action, with the result due to cease operation welder.

Need not cut off power supply, fan cooling machines continue to operate in order to expedite the process, generally 5-10 minutes (with the ambient temperature and ventilation conditions change) will be able to resume operations. (Note : The candle cellulose electrode, due to upgrade Thrust)

Fourth. The attention

4-1. Use of the environment

1) The use of relatively dry conditions, air humidity ≤ 80%;

2) Ambient temperature range -10℃—+40 ℃;

3) Avoid direct sunshine or rain in the open areas;

4) To avoid the larger dust or corrosive gases in environment.

4-2. Safety Summary

1) To ensure good ventilation conditions

The welder are smaller and compact structure, the output current is large, Natural ventilation components heat has been unable to meet demand, the contents of the fan forced cooling machine.

Please note : users welder front ends of the exhaust and not covered with blinds plug ,Welder place at a location away from the surrounding objects shall not be less than 0.3 m, should ensure that conditions are improving ventilation. It is critical for the normal operation and welder life.

2) To avoid overload

Please occasional users are all in strict accordance with the maximum allowable rate under current conditions to limit the current. should not be overloaded, so as not to reduce the life welder, leading to the burning.

3) Avoidance Overvoltage

 can guarantee that do not exceed the permissible value of welding current, If supply voltage provides higher value of the components may cause damage.

4) There is a grounding screw on the back of each welder, grounding symbols for signs, Before the election section in the four-square-mm shell and wires to be reliable connectivity, not static or leakage causing malfunctions.

Fifth. Maintain (please cut off the power!)

1) Dust regularly, use a clean dry compressed air cleared If Congress and the smoke pollution in the air using welding, done at least once a month to deal with dust.

2) To the required pressure compressed air to avoid damage to the welding small components.

3) Internal inspection of the electrical connection is confirmed contacts good (especially connectors), has reinforced the loose end. If oxidation use sandpaper to remove the oxide film and re-connect.

4) To avoid welding inside the flooded or wet, drying is used otherwise, Measuring with a Megger insulation (including the connections and linkages between and among shell).

Only confirmed that there is no unusual circumstances can continue welding.

5) If do not use of welding machine for a long-term, welding machine shall be placed in the original packaging and stored in dry conditions.

Fixth. Troubleshooting

The following operating requirements : operators must have adequate electrical aspects of a comprehensive security knowledge and expertise, Operators should be able to prove their skills and knowledge to the holders of valid qualification documents.

1、Troubleshooting common ZX7-160

Fault

Exclusion

SMPS light is not bright. Fans will not be diverted without welding output

1、Confirmed Power Switch on.

2、Confirmed the importation of electric power cables accepted.

Power indicator light lit up, fans will not be diverted without welding output

1、Then may be wrong in the importation of 380V power supply, causing overvoltage protection circuit starter, then changed the 220V power supply. can be reset button.

2、220V power instability (excellent long line input) or imported in the lap lane -- online, Starting Over-circuit caused increased the diameter line into the grid; s line input nodes, This machine 5-10 minutes after the reset button relations can be restored.

3、Switching Power Switch for a short period of time caused starter protection circuit. Shutdown 5-10 minutes after the reset button can be restored to normal.

4、The power supply switch to the plate loose lead, re-fastening.

5、24V power relay board did not pull or damage, an 24V power supply and relay. Relay can be used with other types of relay replacement.

Fans turn, welding control potentiometer output current unstable or not, sometimes large, sometimes small currents

1、Potentiometer 1K, quality, and should not change.

2、Connection have access to all, particularly connectors and other required inspections.

Fans turn, it is extremely light does not shine without welding output

1、Various plug-ray machines have access to it.

2、Or have access to the output circuit connecting Department phenomenon.

3、And Instrumentation Power MOS plate to plate (VH-07 plugin) voltage DC380V%

(1) Silicon Bridge traffic, whether by inserting silicon have access to bridge

(2) Power board four large electrolytic capacitor (470UF/450%) among replace individual leakage

4、MOS board auxiliary power supply such as a green light does not shine, please contact the company or dealers

5、The control circuit questions, please contact the company or dealers

Fans turn, very bright light, no welding output

1、May be overcurrent protection, please switch off the machine to be very bright light, and the reset button can be restored to normal.

2、May be overheating protection wait 5-10 minutes in the machine can recover.

3、The inverter circuit fault may be :

Please unplug the power MOS mark the main transformer plugs (near Fan VH-07) reset button :

(1) If the light is still very bright individual boards MOS FET is damaged, find and can be replaced with the type of market management.

(2) If the light is not very bright

A  Plate may be damaged transformer, Measuring be the main electricity transformer primary transformer primary inductance and Q values for parallel L=12.2-2.0mH Q>40

B  Is the second transformer rectifier tube individual breakdown, to find out and replaced with the type of rectifier tube.

4  May be feedback circuit fault.

2、ZX7-250, ZX7-315, ZX7-400, decent and methods to

Fault

Exclusion

No head table shows

Non-rotating fan

No welding output

1、Air switch closure confirmed

2、Then the input power an electric cable.

3、The thermal resistance (4) damage (or 24V relay contact closure is not normally have access points).

4、Power Panel (floor occur without DC537V output voltage) :

(1) Bridge circuit silicon, silicon bridge suture have access.

(2) The power of local boards scorched by fire.

(3) Air power to the switch plate insert lines, power inverter plate to plate (MOS board) insert the line

5、The control board auxiliary power supply part of the fault.(Manufacturers and distributors or links)

Head showed normal

Fans normal rotation

No welding output

1、Various plug-ray machines have access to it.

2、Or have access to the output circuit connecting Department.

3、The inverter circuit fault (extremely bright light)

Please get rid of a board inverter power supply line (near the former panel VH-07 Plug) power cord and transformer (near Fan VH-07 plugin) reset button :

If the fault is very bright light on the inverters, inverter on the fault in another.

Next, turn off any defective power inverter gives the power supply line (the main transformer power cord is not inserted), then the reset button :

A  Plate may be damaged transformers, electric bridge and main transformer primary inductance and Q-value measurements were measured every transformer.

If inductance or small replacement

B  Which may be individual plates rectifier tube defects, replacement

2) If the fault is very bright light in MOS boards, boards of individual inverter FET bad. the same types of field effect transistor replacement

4、The feedback circuit fault (extremely bright light), associated with distributors or manufacturers.

Manual arc welding big fly

Link unreasonable output polarity, output of linear reversed polarity.